The planned ash outlets on the two wastewater plants (Lynetten and Avedoere) has been finalized and they are now in operation. This means, that it is possible to load the ashes into a powder transport lorry, and utilise the ashes in the concrete plant.
Final report for Task 1 is completed.
Status per 2007.01.12